San Francisco Strip Clubs: Powr-Flite Discusses: Getting Out of a Sticky Situation

Posted on January 26, 2012 by strip-club-dj.
Categories: San Francisco strip clubs.

The next morning, the customer called and complained that the floors were “sticky” and wanted the problem corrected as soon as possible. The cleaning crew, uncertain how this could have happened, was also unsure how to correct the problem.
According to Mike Englund, product manager for Powr-Flite, a leading manufacturer of floor care equipment, “Just the fact that the building [is situated] in the water could be a cause. High humidity can extend drying times beyond the normal 20 to 30 minutes it [normally] takes for finish to dry.”
However, Englund also says there can be other reasons for newly refinished floors to be sticky, including:
· Proper rinsing: The floor may not have been properly rinsed after application of finish. Make sure all stripper/chemical residue is removed from the floor before applying finish.

See the full article from “Exec Digital (press release)”

no comments yet.



Leave a comment

Names and email addresses are required (email addresses aren't displayed), url's are optional.

Comments may contain the following xhtml tags:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>